Sign in

Enter your credentials to access the bid calculator.

Bids

Organized by general contractor

New bid

Autosaved
Job info
Default rates
Most fixtures — rough
$
Most fixtures — finish
$
Free standing tub — rough
$
Free standing tub — finish
$
Ice maker box — rough
$
Dishwasher — finish
$
Hose bib — rough
$
Floor drain — rough
$
Phase 1 Underground plumbing
Flat rate  $
Phase 2 Rough-in & finish — rooms by floor
Phase 3 Water heaters
Upgrades Optional add-ons
Allowances Auto-filled from rooms
FixtureQtyUnit priceLine total
Total fixture allowance $0
Underground
$6,000
Rough-in
$0
Finish
$0
Upgrades
$0
Fixture allowance
$0
Labor bid (no allowance)
$6,000
Total bidLabor + fixture allowance
$6,000
Notes
HCP Housecall Pro line items — click any box to copy

Each box is a separate line item. Click Copy and paste directly into Housecall Pro.

New T&M bid

Autosaved
Job info
Default rates
Journeyman — per hour
$
Apprentice — per hour
$
Overhead — per employee/hr
$
Profit margin goal
%
Labor Hours — overhead toggle per row
Description
Type
Hours
Overhead
Labor & overhead total $0
Materials Parts & supplies
Description
Cost
Materials total $0
Labor & Overhead
$0
Materials
$0
Subtotal (before margin)
$0
Profit margin (20%)
$0
Total bid
$0
Total bidLabor + overhead + materials + margin
$0
Notes

New basement bid

Autosaved
Job info
Default rates
Per fixture — rough rate
$
Base price = fixtures × rough rate
Per fixture — finish rate
$
Finish base = fixtures × finish rate
Rough-in Fixtures & rough extras
3
Base price: $3,000
Rough extras
Rough total $3,000
Finish Finish extras
Finish base: $675 (3 fixtures × $225)
Finish extras
Finish total $675
Fixture base (rough)
$3,000
Rough extras
$0
Rough total
$3,000
Fixture base (finish)
$675
Finish extras
$0
Finish total
$675
Base priceRough total + Finish total
$3,675
Notes
HCP Housecall Pro line items — click any box to copy

Each box is a separate line item. Click Copy and paste directly into Housecall Pro.